KAMPALA, UGANDA · MANUFACTURING
Gentex Enterprises
Power stabilisation that lifted production 30%.
The brief.
Gentex runs manufacturing lines in Kampala on a grid that can’t promise a full shift. Ariya’s answer was a 2.6 MWp solar PV system paired with 2.6 MWh of battery storage and full power stabilisation. Voltage and frequency are corrected before they ever reach a machine.
The stabilisation solution ensures genuinely uninterrupted power: when the grid sags or disappears, batteries take the load the same second. Since commissioning, production is up 30% and Gentex’s delivery reliability has become a competitive edge.
See it running.
More of our projects.
All projects + map →
Thika Cloth Mills
2.6 MWp + 2.9 MWhHybrid solar and battery storage for reliable textile production.

Irvine’s Tanzania Ltd
1.5 MWp + 2.2 MWhHybrid solar, battery storage and power stabilisation keeping animal feed production running.

Cold Solutions
1.4 MWp rooftopEast Africa’s largest cold-storage campus, on sunshine.